Step 4 of 7 — Make · parts into finished goods

Run an assembly order

How to6 min read

Short answer

An assembly order turns components into finished units at one location. A supervisor creates it and approves it; whoever is packing opens it on their phone, enters how many they finished in this session, and confirms. Components come off stock and finished units go on, both at that location. You can pack across several sessions until the order is complete.

Last checked 7 Aug 2026Step 4 — MakeView as Markdown

Before this makes sense: Build a bill of materials

Doing this needs the Execute (pack kits) permission.

What is this?

A parts list says what a product is made of. An assembly order is somebody actually making it.

Until someone builds, a gift set exists only as its component parts on a shelf. The assembly order is the one event that consumes those parts and puts finished units on the books, at a named place, on a named day.

This page covers:

How an assembly order moves

Four states, in order.

StatusWhat it means
DraftWritten down, not released. Editable. Nobody can pack it yet.
ApprovedReleased to the floor. It appears in the packing queue.
In progressAt least one session has been packed. Some units are done.
CompletedThe full quantity has been built.

An order that should not have been raised can be dismissed at any point before it completes. Dismissing is not deleting — the order stays visible in history, it just leaves the queue.

Every order names one product, one quantity to build, and one location. The location matters more than it looks: components are taken from there, finished units land there, and an order can only be packed where the parts physically are. Kits are built at a warehouse. A retail counter or an event stall holds stock and sells it, but nobody assembles behind the counter.

Create and approve the order

On a computer, in the assembly orders list:

  1. Click New order and pick the built product. Only products with a parts list can be chosen — there is nothing to consume otherwise.
  2. Enter the quantity to build. The form shows how many the components on hand could support, so you can see straight away whether the number is realistic.
  3. The component lines fill in from the parts list. Each line's expected quantity is the per-unit quantity times the quantity to build, plus wastage, rounded up.
  4. Optionally set a scheduled date and a note for whoever picks it up.
  5. Save. The order lands as a draft.
  6. When you are ready to release it, click Approve.

Approval is the gate. A draft is invisible to the floor, and only an administrator, the supply chain lead or the operations lead can approve one. Approve too early and the queue fills with work nobody has committed to; approve too late and the person at the bench has nothing to do.

If a draft needs changing after approval, revoke the approval first. Approved orders are locked against edits on purpose.

Pack it on the floor

This half is a phone job. The screens are short.

Open Assembly. You see two lists.

  • In progress — orders somebody has already started.
  • Planned, waiting to start — approved orders ready to pick up.

Each row carries a pill. All components ready means every line can cover what is left. Short on components means at least one cannot.

Tap the order you want. Then:

  1. Check the header. It names the product and how many units are left to build.
  2. Set how many you are finishing in this session. It defaults to everything remaining. Tap it down if you are only doing part of it.
  3. Look at the component list. Each line shows exactly how much this session will take, with a coloured dot: green if it is there, amber if it is tight, red if there is none.
  4. Tap the build button. A sheet appears listing every deduction and the finished units going in.
  5. Read the sheet. Confirm.

That is the whole flow. Do not tap twice while it is saving.

You do not have to finish an order in one go. Pack three today, four tomorrow. Each session is recorded on its own, and the order tracks the running total. Once the total reaches the target, the order completes on its own and you land on a confirmation screen.

If you have to stop, tap Pause. The order goes back to the planned list with its progress intact, and anyone can pick it up later.

Starting your own pack

You do not always need a supervisor. Tap New pack and pick a product, and the order is created already in progress so you can start immediately. Use it when the shelf tells you to build something and waiting for paperwork would just be waiting.

What one session does to your stock

One session is one atomic event. Either all of it happens or none of it does.

When you confirm:

  • Each component is deducted at the order's location, one permanent ledger entry per component.
  • The finished units are added at the same location, as their own ledger entry.
  • The order's produced total goes up, and the status becomes in progress or completed.
  • The new numbers are queued out to any storefront that sells from that location.

Nothing is overwritten and nothing is deleted, so any session can be explained later: who packed it, when, how many, and what it consumed.

Sessions never over-consume across a run. The app works out each session's share of the components from the cumulative total, not from the session in isolation, so packing 3 then 4 then 3 takes exactly what packing 10 at once would have taken.

A built product's numbers move in two directions at the same time here. Finished units go up. The units you could still build go down, because the components that backed them are now inside something. The house way of saying it is "we have 25 in stock, and the components to assemble 50 more" — after a session of ten, that is 35 in stock and the components for 40 more.

When a component is short

The session is refused, in full, and nothing is written.

The check runs before anything is saved, at the order's own location, against what is available there — on hand minus whatever is already promised to orders. If any one line cannot cover its share, the whole session raises an error naming the component, how much more it needs, and how much is there.

That is the safe outcome. A half-written session would leave components deducted against units that were never built.

Four things worth checking, in this order:

  • Is the stock at the right place? The most common cause by far. Components at another site do not count. Transfer them in, then pack.
  • Is it promised to something else? Stock reserved by an open order is not available to consume, even though it is physically present.
  • Is the parts list right? A quantity typed as 10 instead of 1 makes an order ten times hungrier than the bench is.
  • Pack a smaller session. If you genuinely have parts for four and the order is for ten, build four now and the rest when stock lands.

Do not work around a shortage by adjusting stock upward to make the screen let you through. That trades a blocked order for a number nobody can trust.

Explore

Writing the parts list. An assembly order can only consume what the product's bill of materials says it is made of. Learn more →

A kit that should be buildable but is not. The usual causes, and which one to check first. Learn more →

Moving components to the bench. Stock has to be at the order's location before it can be consumed there. Learn more →